Strategic Resource Options
Affinity Water’s Strategic Solutions
Along with Severn Trent , the Canal & River Trust and Thames Water, we have been developing four strategic water resource options to deliver social, environmental and economic benefits for the region and communities we serve. We will update this page regularly to share our progress across these solutions and to explain what is happening and when, and how you can find out more.
Background
We provide on average 900 million litres of drinking water to approximately 3.6 million people, or 1.4 million households every day. The water we supply is currently mostly from local sources, with 65% coming from aquifers (porous rocks that store water below the ground) and 35% from rivers. We often have to move our water a considerable distance from where we take it to where we treat it and distribute it to your tap.
Every five years, Affinity Water is required to produce a Water Resources Management Plan (WRMP) setting out how it will manage water supplies over a minimum of the next 25 years. We published our revised draft WRMP on August 2023. This plan considers the key challenges we face, such as climate change, environmental protection, population growth and the risk of drought, in ensuring a resilient future supply of water for our customers.
Our draft WRMP prioritises a demand-management approach to ensuring a resilient supply of water. This includes measures such as installing meters, reducing leakage and promoting household water efficiency. However, we acknowledged that at some point significant new infrastructure (such as inter-regional transfers or reservoirs) will be required to ensure we continue to supply enough water to meet our customers’ needs.
The scale and complexity of potential new infrastructure means that long lead-in times are required; we have to plan for these solutions ahead of time, for them to be 'construction ready', should they be needed.
RAPID
To support the progression of strategic options, the Regulatory Alliance for Progressing Infrastructure Development (RAPID) has been established to help accelerate the development of new water infrastructure. It seeks to improve regulation and remove barriers to help the water sector respond to long-term water resources challenges. RAPID is comprised of representatives from Ofwat, the Environment Agency and the Drinking Water Inspectorate.
Strategic solutions
As part of our planning process, our WRMP considers a number of strategic solutions that could significantly increase future supply and we have been developing these options:
- Minworth: A source of raw water flow augmentation to support either the Severn to Thames Transfer (STT) SRO, the Grand Union Canal (GUC) SRO, or a combination of the two.
- The Grand Union Canal Transfer (GUC): An option that utilises the existing canal infrastructure to transfer treated wastewater from Minworth (STW) in the Midlands to Affinity Water in Hertfordshire and North West London.
- The South East Strategic Reservoir (SESRO): a proposed new reservoir located near Abingdon (Oxfordshire) that offers storage and a resilient supply of raw water to the River Thames during periods of low flow, for subsequent re-abstraction in London.
- The Thames to Affinity Transfer: A raw water transfer that could use a variety of potential source waters (three possible source options SESRO, Severn Thames Transfer or London- recycling options). Two possible ‘corridors’ have been identified: 1) the fluvial Thames; 2) London Re-use - all would include new treatment works and conveyance routes.
Through our planning process Minworth and the Grand Union Canal Transfer have been selected as the first strategic schemes to be delivered with planned completion in the summer of 2032 .
Gate reports
In early July 2021, we submitted the first stage of the assessment of the SROs, called Gate 1 reports, to RAPID for detailed review, this was followed on the 14 November 2022 with the Gate 2 reports.
Additional information submitted to RAPID as part of the review process, and the draft decisions are found in the documents folder on this page.
We are now in the process of developing the Gate 3 documents.